City of Standish Screen Replacement

The City of Standish partnered with Spicer Group to provide engineering design and construction assistance for the replacement of the climbing rake screen at its main sanitary pump station. The existing screen and housing structure had reached the end of their useful life and required full replacement to maintain system reliability.

As part of the project, Spicer Group oversaw the demolition of the existing wooden building, removal of the outdated climbing rake screen, and design of a new, modern screen system. The design phase included detailed process, plumbing, and electrical drawings and specifications to support the installation of the new equipment. These improvements will enhance the pump station’s efficiency and ensure continued effective wastewater conveyance for the City.

Previous
Previous

Carson City Main Pump Station

Next
Next

White Cloud Pump Station