• November Calendar Page

    11.02.2018
    Categories:
    {caption}

    Our 2018 November calendar page features the Kochville Drain project in Kochville Township. To build a new section of road, this drain had to be completely relocated.

    It plays an important role in conveying storm water away from the growing Township. Nearly 300 feet of buried 72-inch diameter culvert was installed with this project.

    Feel free to download and print out this page!