![]() |
||||
![]() |
Advertisements
PEAKE ACRES DRAIN IONIA COUNTY DRAIN COMMISSIONER - JOHN BUSH JDR-1857-01-JDR-1857-01 JDR-1857-02-JDR-1857-02 JDR-1857-03-JDR-1857-03 JDR-1857-04-JDR-1857-04 DOWNTOWN STREETSCAPE IMPROVEMENTS, PHASE I CITY OF BELLEVILLE Advertisement Addendum No. 1 Addendum No. 2 Addendum No. 3 FRED DOW DRAIN MUSKEGON COUNTY Advertisement (0.1 MB) Bidding Document (50 MB) Plans - Sheet 1 (0.3 MB) Plans - Sheet 2 (Revision Date 02/09/10) (1.5 MB) Plans - Sheet 3 (Revision Date 02/09/10) (3.4 MB) Plans - Sheet 4 (0.4 MB) Plans - Sheet 4 Details (0.3 MB) Bidders List (1.0 MB) Addendum No. 1 (0.4 MB) Soil Borings (1.0 MB) Boring Location Map (1.1 MB) Addendum No. 2 (Revised) (0.5 MB) Bidform (Revised) (0.3 MB) Bid Tabulation (0.1 MB) PIPING
& HEATING SYSTEM REPLACEMNT AT CENTRAL AND BRYANT TEMPERATURE CONTROL SYSTEM AT CENTRAL AND
BRYANT ASBESTOS PIPE INSULATION REMOVAL
AND ENCAPSULATION SERVICES, IN ADVANCE OF CENTRAL AND BRYANT ELEMENTARY
SCHOOL PIPING REPLACEMENT
|
![]() |
||
![]() |
||||